Share
Share
Email
Post
Share
SUMMARY:
The Construction Scheduler partners with Division Leads, Project Managers, General Superintendents, and Superintendents to develop, document, and assess project timelines. They oversee the scheduling of all construction activities, focusing on maintaining workflow efficiency and supporting project profitability. This role involves tracking project progress, highlighting potential delays or risks, and offering suggestions to enhance scheduling accuracy and overall project planning. The Scheduler also ensures that timelines are followed and promptly reports any critical issues that may affect project delivery.
Our search is currently limited to qualified candidates living within the Hampton Roads commuting area.
ESSENTIAL FUNCTIONS / MAJOR RESPONSIBILITIES:
- Oversee all project scheduling activities using Primavera P6/CPM Scheduling throughout both the design and construction phases.
- Input actual start and finish dates, along with percent completion, based on updates from Superintendents and Project Managers.
- Attend job site meetings, collaborate with stakeholders, and visit job sites as needed to develop the project schedule.
- Integrate submittal timelines into the schedule by referencing the most current submittal register.
- Support the creation of initial and baseline schedules by collecting and organizing necessary data.
- Work with Superintendents to develop detailed two-week look-ahead schedules.
- Provide schedule-related information for inclusion in daily reports prepared by Superintendents.
- Collaborate with estimating and business development teams to build proposal and bid-phase schedules.
- Integrate all project schedules into a comprehensive program schedule to provide a complete view of all ongoing projects monthly.
- Continuously update all schedules to reflect actual progress and measure performance against the baseline and contractual requirements.
- Cost-Load the schedules to create the back-up documentation for AIA Billing Documents.
- Generate future monthly billing projections from the cost-loaded data in the schedules for the CEO/President.
- Generate monthly schedule updates, including narratives, standard and custom graphs and charts, and customized reports as requested.
- Develop and/or review time extension requests.
- Prepares Time Impact Analysis for identified risks to schedule as needed.
- Develop Recovery Plans in coordination with the Superintendent and Project Manager when delays occur.
- Develops documentation for claims, assists in identifying potential claims, and takes steps to prevent or defend against them.
- Identify and manage critical path activities, adjust schedules based on project conditions, and work with leadership to implement strategies that keep the project on track.
- Must reside within commuting distance of our main office in Virginia Beach, VA.
- This is an in-person, on-site position – no telecommuting.
POSITION SPECIFIC QUALIFICATIONS & EXPERIENCE
- 3-5 years of proven experience in commercial project scheduling.
- Experienced with critical path method analysis.
- Proficiency in Microsoft Office Suite with expert skill level in Excel.
- Advanced Proficiency in Primavera P6.
- Preferred: Experience in scheduling related projects for the NAVFAC or USACE.
- Be able to travel to jobsites occasionally to perform site visits to support schedules.
- Effective reporting and communication skills.
- Strong mathematical and analytical skills.
- Ability to read and interpret complex architectural drawings.
- Critical thinking skills to analyze and report accurate project schedule information.
- Must have a valid driver license.
- Must be qualified to access government bases.
- Must be 18 years of age.
- Must be punctual and reliable.
- Must be organized and have an eye for detail.
KNOWLEDGE, SKILLS & ABILITIES:
- Dependable.
- Attention to Detail.
- Follow through.
- Proactively identifies potential issues.
- Solve problems calmly and collaboratively.
- Willingness to receive and give constructive performance feedback.
- Manage time and competing priorities.
- Ability to travel to jobsites as needed.
PHYSICAL DEMANDS:
- The physical demands described here are representative of those that must be met by an employee to successfully perform the essential functions of this job.
- This position involves work at a construction site where duties will be performed both indoors andoutdoors.
- Overtime may be required from time to time to meet projectdeadlines.
- Dexterity of hands and fingers.
- The employee must occasionally lift and/or move up to 50pounds.
- Ability to perform job duties while standing, bending, lifting, kneeling, stooping, crouching, crawling, balancing, and climbing for extended periods.
- 401(k) – w/ employer match up to 3% of annual income after (1) year of employment.
- Paid Time Off (8 Days) – New Year, Memorial Day, Independence Day, Labor Day, Thanksgiving, & Christmas + 2 additional days, usually utilized at Christmas and Thanksgiving
- Earned Leave (Vacation/Sick) – 80 Total Hours Accrued Annually
- Vacation (24 hours annually, accrued at 0.47 hours a week) – never expires, but caps at 24 hours.
- Sick (up to 56 hours annually, accrued at 1 hour of paid sick leave for every 30 hours worked) – never expires, but caps at 56 hours.
- Voluntary supplemental insurance options are available to employees at their own expense.
- Voluntary life insurance is available to employees at their own expense.
EOE/M/F/Disability/Vet
DISCLAIMER:
This job description is intended to describe the general nature and level of work being performed by individuals assigned to this position. It is not intended to be an exhaustive list of all duties, responsibilities, or qualifications associated with the job. The employer reserves the right to modify, add, or remove duties and to assign other duties as necessary. Employment remains at-will unless otherwise specified in a written agreement.
Equal Opportunity Employer, including disabled and veterans.
#J-18808-Ljbffr