Waco, United States | Posted on 11/10/2026
- Expectedto be long term. 6 months to start. Thereafter, renew YOY.
- Theteam hired permanent headcount due to the expected length.
- Atthis point, they need contract support for the next year or two as well due topermanent headcount being maxed out. That speaks to how long term this is likely to go.
- Willingto take candidates that seek shorter term so long as they see the build, test,and commissioning on equipment through. They can leave prior to phase two if they wish.
Top3 Skills:
- Localto the facility city in Temple Texas
- Functiontesting on protection relays (SE Easergy P5, P7, SEL and etc)
JobDescription:
Weare seeking a Commissioning Technician to support onsite commissioning andfunctional testing of power distribution and electrical control systems atcustomer facilities. This position is 100% onsite and will focus heavily ontesting PLC- and protection relay-based Auto Throw Over (ATO) schemes. Theideal candidate will have hands-on experience working within power distributionenvironments and a strong understanding of switchgear, PLC controls, protectionrelays, and electrical troubleshooting. Candidates may come from either anengineering or technician background, provided they have practical fieldexperience commissioning and testing electrical control systems.
Day-to-DayResponsibilities
Ona day-to-day basis, this individual will perform onsite commissioning andfunctional testing of power distribution control systems. They will loadprograms into Modicon M340/M580 PLCs and Vijeo HMIs, perform input/outputchecks, and execute functional testing to verify that equipment operatesaccording to the required sequence of operations. The individual will test AutoThrow Over schemes controlled by PLCs or protection relays and troubleshootissues such as wiring errors, incorrect signals, or system functionalityproblems discovered during commissioning. They will also load setting filesinto protection relays and perform protective-function testing using secondaryinjection test equipment. The role requires someone comfortable workingdirectly with switchgear, PLCs, protection relays, and electrical powerdistribution equipment in a customer-site environment.
Must-Haves
- 3+years of relevant experience in commissioning, electrical controls, powersystems, or power distribution.
- Hands-onpower distribution experience, including an understanding of electricaldistribution systems and their operation.
- Strongunderstanding of switchgear and how switchgear interfaces with PLCs, protectionrelays, and control systems.
- Hands-onPLC experience, preferably with Modicon M340 and/or M580 PLCs.
- Experiencewith protection relays, including loading relay settings and/or performingprotective-function testing.
- Commissioningand troubleshooting experience, including I/O checks,functional/sequence-of-operation testing, and diagnosing wiring orcontrol-system issues in the field.
Plusses
- Experiencecommissioning or testing Auto Throw Over (ATO) / automatic transfer schemes.
- Experiencewith Easergy P5/P7 or SEL protection relays, including secondary injectiontesting.
- Experiencewith Vijeo HMI software and loading or commissioning HMI applications.
Qualifications:
- Goodunderstanding of Switchgear
- Experiencewith protection relays & PLC
- Familiaritywith ATO application
JobDuties:
- Thisperson will design and setup equipment via uploading files and controls, testequipment, integrate equipment, then commission equipment at the datacentrebeing built in Temple Texas. They will be part of a larger team that handles Datacenters across the US withtheir focus on the data center being built for client.
- Theywill be part of a larger team that handles Datacenters across the US with theirfocus on the data center being built for client.
- Thescope of work is to perform commissioning/functional testing at Customer site.The work is performed 100% on site.
Toperform functional testing on PLC (Modicon M340/M580) or protection relay (SEEasergy P5 & P7) based Auto Throw Over (ATO) schemes
- Loadprograms into the PLC & HMI (Vijeo)
- Inputs& Outputs check
- Functional(sequence of operation) testing
- Troubleshootingthe system (i.e: wiring errors)
Toperform protective function testing on protection relays (SE Easergy P5, P7,SEL and etc)
- Loadsetting files into protection relays
- Performsecondary injection testing using test set
#J-18808-Ljbffr