Sibanye-Stillwater is seeking a UG Construction worker (1, 2 or 3) for the East Boulder Mine in McCleod, MT on a rotating 7x7 schedule. The role involves operating equipment, building forms, installing rebar, pouring concrete, and performing steel fabrication and maintenance across mine projects.
You will read drawings, work with pipes, manage shotcrete, grouting, and welding tasks, and collaborate with teams while following health, safety and environmental regulations.
#J-18808-Ljbffr
This role, Underground Construction Technician: Heavy Equipment & Welding at Sibanye Stillwater, could be your next career step.
This opportunity is part of our work in Engineering.
The advertised compensation is 60.000 - 95.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.
Learn more about the Underground Construction Technician: Heavy Equipment & Welding role in the description above.