Hudbay Minerals is seeking a Production Driller for the Copper World project in Arizona. The role involves high-output open-pit blast hole drilling with platform and pioneer drills, following precise plans, and ensuring safety and equipment reliability on site.
The ideal candidate has at least 1 year of surface/open-pit drilling experience, MSHA Part 48 certification (or willingness to obtain), and a valid driver’s license. Rotating 12-hour shifts and on-site travel are required.
#J-18808-Ljbffr
Consider building your career as a Open-Pit Production Driller (12-Hour Shifts) at Copper world.
This opportunity is part of our work in Engineering.
The advertised compensation is 65.000 - 90.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.
Learn more about the Open-Pit Production Driller (12-Hour Shifts) role in the description above.