Charlest, SC
It’s an exciting time to join MGAC!
MGAC is a global boutique consultancy dedicated to managing and representing our clients’ best interests. Our success is rooted in hiring exceptional people who are driven to do challenging work with the unique blend of experience, integrity, creativity, and commitment that separates us from our competitors.
We have three simple goals: to do the most interesting and challenging work, to have fun working together, and to build a successful business in the process.
This position requires significant onsite presence in Charleston, SC with travel required based on project and client needs.
Unlock Your Potential
We're looking for candidates eager to lead complex mission-critical projects, influence project outcomes, and drive operational excellence across large-scale data center developments. Here's what will set you up for success at MGAC:
- 5+ years of experience in commissioning, construction management, mission-critical facilities, or data center infrastructure projects.
- 3+ years of experience managing commissioning teams, consultants, and multidisciplinary project stakeholders.
- Bachelor’s degree in Engineering, Construction Management, Mechanical Engineering, Electrical Engineering, or a related technical field. Equivalent experience will be considered.
- Extensive experience supporting hyperscale, colocation, enterprise, or mission-critical data center construction projects.
- Experience leading Level 1-5 commissioning activities for complex MEP and critical infrastructure systems.
- Strong knowledge of electrical distribution, UPS systems, generators, HVAC systems, controls, BMS, EPMS, SCADA, and integrated systems testing.
- Excellent analytical, organizational, leadership, problem-solving, presentation, interpersonal, verbal, and written communication skills.
- Proven ability to manage multiple projects simultaneously while balancing schedule, budget, risk, quality, and client expectations.
- A collaborative leader who thrives in fast-paced environments and is passionate about delivering exceptional project outcomes.
What You'll Be Doing
MGAC's Critical Environments team manages some of the most complex and high-profile data center projects in the industry. As a trusted owner's representative, we help clients navigate technical challenges, mitigate risks, and ensure facilities are delivered ready for operations. As a Data Center Construction – Mid - Senior Commissioning Project Manager you will lead commissioning strategy and execution across large-scale mission-critical projects and serve as a key advisor to clients throughout the project lifecycle.
- Lead and manage commissioning teams including Commissioning Managers, Engineers, Project Managers, and third-party commissioning partners.
- Oversee commissioning activities across multiple concurrent data center construction projects.
- Develop commissioning strategies, resource plans, project schedules, and execution methodologies.
- Provide technical leadership throughout design, construction, testing, and turnover phases.
- Mentor and develop team members while promoting a culture of quality, accountability, and safety.
- Direct the full lifecycle of Level 1-5 commissioning activities.
- Review and approve commissioning plans, scripts, procedures, reports, and turnover documentation.
- Oversee equipment start-up, functional performance testing, integrated systems testing (IST), load bank testing, and operational readiness activities.
- Develop and maintain commissioning logs, deficiency logs, equipment checklists, SOPs, MOPs, and project documentation.
- Ensure consistency and compliance with company quality processes and commissioning standards.
Technical Oversight
- Lead commissioning efforts for critical infrastructure systems, including:
- Electrical distribution systems
- Medium- and low-voltage power systems
- UPS systems and battery plants
- Standby generators and fuel systems
- Chillers and cooling plants
- CRAH and CRAC units
- Building Management Systems (BMS)
- EPMS and SCADA systems
- Fire alarm and life safety systems
- Emergency power systems
- Review design documents, specifications, shop drawings, and equipment submittals for commissioning requirements.
- Support troubleshooting, issue resolution, and deficiency management during testing and startup activities.
- Verify testing results and ensure systems meet owner project requirements and operational objectives.
Client Relationship Management
- Serve as a trusted advisor and primary commissioning lead for clients and project stakeholders.
- Facilitate commissioning meetings, project reviews, and progress reporting.
- Coordinate activities among contractors, consultants, vendors, equipment manufacturers, and owner representatives.
- Proactively identify project risks and develop mitigation and recovery strategies.
- Maintain the client's vision while ensuring successful project delivery.
Our Critical Environments project work continues to experience tremendous growth, with a robust pipeline of hyperscale, colocation, and mission-critical projects across North America.
Why Work With Us?
- 30+ years strong in North America and growing fast with a positive, energizing culture.
- Consistently recognized as a Top Workplace with a true employee-first mindset.
- Entrepreneurial spirit encouraged. Bring fresh ideas and exceed client expectations.
- Global reach, yet agile and client-focused like a boutique firm.
- Your voice matters. Flat structure, open doors, and recognition for your contributions.
- Exposure to some of the most complex and innovative data center projects in the industry.
- Strong work-life balance, generous PTO, and top-tier wellness benefits.
Beyond the Paycheck: Discover Our Benefits
- Recognized as a Top Workplace for over a decade.
- Vacation starts on day one. Accrue 3 weeks per year, plus a paid birthday off.
- 8 sick days and 9 paid holidays annually for full-time employees.
- Competitive benefits that support both personal and professional growth.
- Professional development opportunities and support for industry certifications.
Salary Range
$110,000-$160,000 per year (commensurate with experience)
The advertised salary range is intended as a general guideline and may vary based on factors such as experience, expertise, certifications, and location. This base salary does not reflect the full compensation package, which may include bonuses, a 401(k) match, and other benefits.
U.S. Standard Demographic Questions
We invite applicants to share their demographic background. If you choose to complete this survey, your responses may be used to identify areas of improvement in our hiring process.
Voluntary Self-Identification
For government reporting purposes, we ask candidates to respond to the below self-identification survey.Completion of the form is entirely voluntary. Whatever your decision, it will not be considered in the hiringprocess or thereafter. Any information that you do provide will be recorded and maintained in aconfidential file.
As set forth in MGAC’s Equal Employment Opportunity policy,we do not discriminate on the basis of any protected group status under any applicable law.
If you believe you belong to any of the categories of protected veterans listed below, please indicate by making the appropriate selection.As a government contractor subject to the Vietnam Era Veterans Readjustment Assistance Act (VEVRAA), we request this information in order to measurethe effectiveness of the outreach and positive recruitment efforts we undertake pursuant to VEVRAA. Classification of protected categoriesis as follows:
A "disabled veteran" is one of the following: a veteran of the U.S. military, ground, naval or air service who is entitled to compensation (or who but for the receipt of military retired pay would be entitled to compensation) under laws administered by the Secretary of Veterans Affairs; or a person who was discharged or released from active duty because of a service-connected disability.
A "recently separated veteran" means any veteran during the three-year period beginning on the date of such veteran's discharge or release from active duty in the U.S. military, ground, naval, or air service.
An "active duty wartime or campaign badge veteran" means a veteran who served on active duty in the U.S. military, ground, naval or air service during a war, or in a campaign or expedition for which a campaign badge has been authorized under the laws administered by the Department of Defense.
An "Armed forces service medal veteran" means a veteran who, while serving on active duty in the U.S. military, ground, naval or air service, participated in a United States military operation for which an Armed Forces service medal was awarded pursuant to Executive Order 12985.
#J-18808-Ljbffr