Ramos CS, now part of Colliers Engineering & Design, seeks a Change Order Manager to oversee contract changes within the Project Controls group on a light rail extension program. This on-site Seattle role tracks changes, supports negotiations, and provides timely dispute analyses throughout the contract lifecycle.
You will work with the Resident Engineer, Cost Estimator, and Lead Scheduler to ensure accurate cost impacts, manage change orders, and maintain compliant documentation per the
#J-18808-Ljbffr
Consider building your career as a Change Order Lead - Transit & Rail (Seattle On-Site) at UNAVAILABLE.
The position is based in Seattle, WA, United States.
This opportunity is part of our work in Management & Operations, Engineering.
The advertised compensation is 110.000 - 180.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.