Planning and Scheduling Specialist – Houston, TX (Downtown)
Duration: 1-year rolling contract
Pay Range: $90-130/hr. (DOE)
Schedule: Flexible (onsite Mon-Thur, work from home on Fridays)
Role Summary:
The Planning and Scheduling Specialist supports integrated planning and schedule control for offshore subsea, facilities, and major capital projects, including work in support of GOA operations. The role is responsible for maintaining and continuously improving GOA Asset Schedules and applying disciplined planning practices, progress measurement, schedule analysis, and forecasting to support timely decisions and predictable execution. This position reports to the Planning and Scheduling Lead within the Project Services organization and works closely with project teams, contractors, Operations, and functional stakeholders to build credible schedules, maintain data quality, identify schedule risks, and communicate progress, variances, and recovery options. The role is an individual contributor position that may coordinate planning inputs from contractors and discipline teams but does not carry formal people-management responsibility.
Job Description:
The Planning and Scheduling Specialist develops, updates, and analyzes project schedules while maintaining the GOA Asset Schedules needed for integrated planning, asset readiness, and execution visibility. The role partners with Project Management, Engineering, Procurement/Supply Chain, Fabrication, Construction/Installation, Commissioning, Operations, and contractors to support baseline maintenance, progress updates, contractor schedule integration, schedule look-aheads, performance reporting, and mitigation planning. Offshore and brownfield constraints are incorporated into the schedule, including marine spreads and vessel availability, weather windows, SIMOPS, permit-to-work and access constraints, and tie-in window readiness.
Key Responsibilities:
- Develop, update, and maintain integrated project schedules in Primavera P6 or equivalent, including WBS alignment, activity coding, calendars, logic ties, milestones, and progress measurement rules.
- Maintain and continuously improve GOA Asset Schedules by integrating project, operations, maintenance, and execution activities to improve visibility, milestone tracking, and readiness reporting.
- Support baseline development, approved schedule changes, and traceability between baseline, current, and forecast schedules.
- Integrate contractor, discipline, logistics, supply chain, and offshore execution inputs into the schedule, including long-lead procurement, fabrication readiness, marine spread sequencing, weather windows, SIMOPS, and key interface milestones.
- Collect progress updates, maintain look-ahead plans, track key milestones, identify slippage, and prepare concise schedule narratives and reporting packs for stakeholders and governance routines.
- Perform schedule quality checks, including logic integrity, open ends, constraints, critical path realism, and excessive leads/lags; support corrective actions to improve schedule health.
- Support schedule risk analysis, scenario planning, and recovery schedule development by providing inputs, assessing time impacts, and incorporating approved mitigation actions into forecasts.
- Coordinate planning inputs from project teams, Operations, contractors, discipline leads, and stakeholders; follow up on open actions and communicate constraints, risks, and recovery options clearly.
- Maintain schedule control artifacts, including basis of schedule, assumptions and constraints logs, action registers, review notes, change records, and closeout archives.
- Apply planning standards, templates, and schedule quality practices while supporting continuous improvement in scheduling processes, tools, and reporting routines.
Key Deliverables:
- GOA Asset Schedule and Integrated Master Schedule (IMS) maintained with agreed WBS/coding, logic, calendars, progress measurement rules, milestones, and readiness visibility.
- Baseline package (Basis of Schedule, assumptions/constraints, milestones, and approval records) with change traceability.
- Status cycle outputs: schedule updates, look-ahead schedules, critical path and slippage analysis, and schedule narratives for governance.
- Schedule quality/health diagnostics and corrective-action log (e.g., open ends, constraints, unrealistic lags, logic breaks).
- Scenario and recovery schedules supporting mitigation plans, offshore campaign optimization, and decision support.
- Schedule risk analysis (when applicable): risk model inputs, run outputs, and confidence-level forecasts communicated to stakeholders.
Required Qualifications:
- Bachelor’s degree in engineering, Construction Management, Project Management, or related discipline; equivalent experience considered.
- Minimum 5–7 years of project planning and scheduling experience on capital projects, turnarounds, or integrated project portfolios.
- Experience working in an Owner/Operator environment and/or directly supporting operator-led offshore projects (operator experience strongly preferred).
- Experience coordinating schedule inputs across project teams, contractors, or discipline groups.
- Experience supporting capital projects across subsea, facilities, or offshore scopes, including interfaces, long-lead procurement, and contractor execution.
- Experience with subsea and offshore project phases and deliverables (FEED through Execute), including long-lead subsea equipment, fabrication yards, offshore installation campaigns, and commissioning/start-up readiness.
- Strong proficiency in Primavera P6 or equivalent, including baseline management, logic development, progress updates, and reporting; experience with MilestonePro is preferred.
- Proficient in Microsoft Office (Excel, PowerPoint, Word), including advanced Excel skills for schedule data analysis (filters, pivots, lookups) and structured reporting.
- Experience with reporting and collaboration tools (e.g., Power BI, SharePoint/Teams) to publish schedule dashboards, manage controlled artifacts, and support governance reporting cycles.
- Working knowledge of project controls practices (progress measurement, forecasting, change control) and schedule quality/health checks.
- Strong facilitation and stakeholder coordination skills; able to challenge constructively, clarify assumptions, and support alignment on schedule logic, dates, and commitments.
- Clear written and verbal communication skills with the ability to produce concise schedule narratives and executive-ready reporting.
Preferred Qualifications:
- Experience managing or maintaining integrated asset schedules for offshore, operations, or capital project portfolios.
- Experience integrating EPC contractor schedules and administering schedule requirements in contracts.
- Schedule risk analysis experience (quantitative/qualitative) and familiarity with SRA tools and methods.
- Proficiency with schedule analysis/health and risk tools such as Deltek Acumen Fuse and Deltek Acumen Risk to perform diagnostics, quality metrics, and quantitative schedule risk analysis.
- Experience building risk schedule models (e.g., drivers, distributions, and mitigation scenarios) and translating results into practical schedule contingencies and recovery actions.
- Experience supporting offshore campaign planning, brownfield execution constraints, SIMOPS, weather-window planning, and marine logistics coordination.
- Familiarity with integrated asset planning routines, milestone readiness reviews, and cross-functional schedule alignment with Operations and project teams.
- Experience supporting planning system implementations, standard schedule templates, process improvements, or reporting automation initiatives.
- Professional certification (PMP, PMI-SP, AACE, or equivalent).
Working Conditions / Travel:
- Primarily office-based with regular engagement with project teams, contractors, and fabrication/offshore execution stakeholders (including virtual coordination across time zones, as needed).
- Travel may be required, including site/fabrication yard visits and execution readiness reviews, depending on assignment.
- Must be able to meet applicable safety training, medical, and fitness-to-work requirements for field/offshore access, as required by assignment.
Key Interfaces:
- Project Manager and Project Engineer
- Engineering disciplines, Document Control, and Technical Authorities (as applicable)
- Procurement/Supply Chain and Logistics
- Construction Management and Field Execution teams
- Subsea (SURF) engineering and delivery teams; offshore installation and marine operations, as applicable
- GOA Operations and asset stakeholders for Asset Schedule inputs, constraints, milestone validation, and readiness alignment.
- Fabrication yards and package suppliers (subsea hardware, umbilicals, risers/flowlines), and offshore campaign contractors (as applicable)
- Project Controls (Cost, Risk, Change Management, Reporting/Analytics)
- Planning systems and reporting teams, including Omega implementation support as applicable for system/process rollout, configuration, training, and reporting alignment.
- Contractors and vendors (EPC, construction, specialty services)
Success Measures:
- Baselines established and maintained through disciplined change control with full traceability (baseline ? current ? forecast).
- GOA Asset Schedules are maintained with current logic, milestones, constraints, readiness visibility, and documented updates to support integrated planning decisions.
- Sustained schedule quality (sound logic, minimal open ends, controlled constraints, realistic critical path, and consistent progress rules) supported by routine diagnostics.
- Forecasts and narratives delivered on the agreed cadence, with early identification and escalation of slippage, constraints, and mitigation options.
- Stakeholder alignment supported through clear schedule updates, milestone tracking, interface visibility, and documented recovery actions.
- Audit-ready schedule packs (extracts, dashboards, narratives, and control records) that support governance decisions and internal/external reviews.
#J-18808-Ljbffr