Overwatch Mission Critical is seeking a mechanical/electrical design professional to support the construction and management of state-of-the-art data centers. You will apply knowledge of UPS, switchgear, batteries and generators, and work with design consultants to ensure specifications, safety, and arc-flash compliance.
Candidates should have 5+ years of relevant experience in design administration or construction administration, preferably in mission-critical systems.
#J-18808-Ljbffr
This posting is for the Electrical Engineer — Data Center Construction role at Overwatch-Mission-Critical, based in De Soto, KS, United States.
Join Overwatch-Mission-Critical and contribute to our ongoing work.
Take a moment to read everything above and see whether this role is right for you.
We are looking to fill the Electrical Engineer — Data Center Construction position at Overwatch-Mission-Critical in De Soto, KS, United States.
The Electrical Engineer — Data Center Construction role at Overwatch-Mission-Critical is now open for applications in De Soto, KS, United States.