CEC Companies seeks a Safety Training Manager to lead field safety on active hyperscale data center projects. You will deliver in-house training, maintain OSHA records, and enforce safety standards across trades with stop-work authority when needed.
The role requires CHST; CSP and OSHA 500Trainer credentials are preferred, plus extensive experience with safety programs and incident investigations in large construction sites.
#J-18808-Ljbffr
Join us at Cec Facilities Llc as our next Field Safety Training Lead for Data Center Construction in Irving, TX, United States.
The position is based in Irving, TX, United States.
This opportunity is part of our work in Engineering, Other.
The advertised compensation is 110.000 - 140.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.