The Superior Group seeks a Construction Project Estimator focused on electrical estimating for field-based projects in Port Washington, Wisconsin. You will interpret drawings, read specifications, and perform takeoffs to capture scope changes in collaboration with project operations, field supervision, subcontractors, and clients.
Responsibilities include developing change orders, pricing using labor units and historical data, and maintaining a change order log.
#J-18808-Ljbffr
The Electrical Project Estimator - Field-Based Change Orders role at The Superior Group is now open for applications in Port Washington, WI, United States.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.
Learn more about the Electrical Project Estimator - Field-Based Change Orders role in the description above.
We appreciate your interest in this position.
Join The Superior Group and contribute to our ongoing work.