Multiple Locations: Houston, TX or Washington, D.C. Metropolitan Area (initial base), with transition to Project Site(s)
Company: Fortune 500 Energy Company
Position Overview
We are seeking an experienced Data Center Construction Director to lead the planning, execution, and delivery of large-scale data center construction projects. This role will initially be based in the Washington, D.C. metropolitan area, with a planned transition to project site(s) as projects advance. The successful candidate will oversee multi-million to multi-billion dollar capital projects, ensuring on-time, on-budget delivery while meeting rigorous safety, quality, sustainability, and operational standards for a leading Fortune 500 energy company.
Key Responsibilities
- Lead end-to-end construction delivery of hyperscale and enterprise data center projects, from site selection and early design through commissioning and handover.
- Develop and manage overall project execution strategies, schedules, budgets, risk registers, and contingency plans.
- Oversee general contractors, design firms, specialty trade partners, and internal cross-functional teams (engineering, power, cooling, IT, operations, legal, and EHS).
- Ensure strict adherence to safety protocols, quality standards, building codes, and company ESG/sustainability requirements.
- Manage complex interfaces including high-voltage power delivery, electrical distribution, mechanical systems (chilled water, free cooling, etc.), structural, civil, and low-voltage/IT infrastructure.
- Drive value engineering, constructability reviews, and continuous improvement while protecting schedule and cost.
- Serve as the primary construction lead for owner-side decision-making; escalated issues and recommend solutions to senior leadership.
- Coordinate permitting, utility interconnects, and local/state regulatory requirements across jurisdictions.
- Build and lead high-performing project teams; mentor construction managers and site leadership.
- Maintain strong relationships with key external partners and internal stakeholders while representing the company professionally in the field and in executive forums.
- Support the transition of completed facilities to operations teams and capture lessons learned for future programs.
- Travel as required between the D.C. area, Louisiana project sites, and other locations.
Required Qualifications
- Bachelor’s degree in Construction Management, Civil/Mechanical/Electrical Engineering, or related field (Master’s preferred).
- 15+ years of progressive construction experience, with at least 8–10 years in data center, mission-critical, or large industrial/energy infrastructure projects.
- Proven track record delivering complex, large-scale data center or similar mission-critical facilities (preferably hyperscale).
- Strong technical understanding of data center critical systems: power (UPS, generators, switchgear, medium/high voltage), mechanical/cooling, structural, and IT infrastructure.
- Demonstrated success managing budgets, schedules, and multi-contractor environments on projects of significant scale.
- Experience leading owner-side or construction management teams on capital projects.
- Excellent leadership, communication, negotiation, and stakeholder management skills.
- Willingness and ability to travel frequently and work in active construction environments.
- Professional Engineer (PE) license or equivalent preferred but not required.
Preferred Qualifications
- Experience with Fortune 500 or large energy/utility company capital programs.
- Experience with modular, prefabricated, or rapid-deployment data center construction methods.
- Knowledge of sustainability standards (LEED, energy efficiency, water stewardship) relevant to data centers.
- PMP, CCM, or similar project management certification.
#J-18808-Ljbffr