Nox Group is seeking a Director of Construction to lead major data center and mission-critical construction programs nationwide. The role oversees multi-project execution, drives safety, quality, schedule, and profitability while guiding senior field teams.
The ideal candidate has extensive experience in large-scale infrastructure, strong leadership presence, and proficiency with Primavera P6. A Bachelor’s or Master’s in Construction Management or Engineering is preferred.
#J-18808-Ljbffr
Consider building your career as a Data Center Construction Director – Mission-Critical at RMCI, Inc.
All applications are reviewed carefully by our team.
The position is based in Pecos, TX, United States.
This opportunity is part of our work in Engineering.
The advertised compensation is 180.000 - 260.000.
We aim to respond to suitable candidates as soon as possible.
Full responsibilities and requirements are described in the listing above.