Civil Construction Combo Welder
DIHO Consulting USA is currently seeking experienced Civil Construction Combo Welders for a large-scale Data Center construction project in Hubbard, Texas. This is a temp-to-hire opportunity offering $40.00 per hour, with per diem and meals provided. We are looking for skilled welders who thrive in industrial construction environments and are committed to producing high-quality work while maintaining strict safety standards.
Location
Hubbard, TX
Pay
$40.00/hour
Benefits
- Per diem provided
- Meals provided
- Overtime opportunities
- Temp-to-Hire position
- Long-term project with growth potential
- Opportunity to work on a major data center construction project
Position Summary
The Civil Construction Combo Welder will perform structural welding, fabrication, installation, and repair work on a large-scale data center construction site. Candidates should be proficient in multiple welding processes and capable of working in a fast-paced industrial construction environment while meeting quality, productivity, and safety requirements.
Essential Duties & Responsibilities
- Perform welding using SMAW (Stick), FCAW (Flux Core), MIG, and TIG processes as required.
- Weld structural steel components, supports, brackets, platforms, handrails, and other construction materials.
- Read and interpret blueprints, welding symbols, drawings, and specifications.
- Fabricate and fit metal components according to project requirements.
- Operate welding and cutting equipment, grinders, torches, and hand tools.
- Inspect welds to ensure compliance with project quality standards.
- Assist with installation and modification of structural assemblies.
- Follow all site safety requirements, OSHA regulations, and project procedures.
- Maintain a clean and organized work area.
- Work closely with supervisors, fitters, and construction crews to meet project timelines.
Required Qualifications
- Previous experience as a Combo Welder in civil, commercial, industrial, or heavy construction environments.
- Proficiency in Stick (SMAW) and Flux Core (FCAW) welding processes.
- Ability to pass a welding test.
- Ability to read blueprints and welding symbols.
- Experience using fabrication and measuring tools.
- Strong understanding of construction site safety practices.
- Ability to work overtime and weekends as needed.
- Ability to lift up to 50 pounds and perform physically demanding work.
Preferred Qualifications
- Experience on large-scale industrial, energy, manufacturing, infrastructure, or data center projects.
- AWS Welding Certifications.
- Structural steel fabrication and erection experience.
- Experience working in fast-paced construction environments.
Work Environment
- Active construction site environment.
- Exposure to outdoor weather conditions, heat, noise, dust, and heavy equipment.
- Use of required PPE at all times.
- Safety-sensitive position.
Employment Type
Temp-to-Hire
#J-18808-Ljbffr