Job Description
Job DescriptionSENIOR CONSTRUCTION SCHEDULER
Minimum Requirements
Education:
- Graduation from a recognized college or university with a bachelor's degree in construction management, engineering, architecture or any related field
Experience:
- Minimum of Ten (10) years full time paid professional experience in Construction Scheduling
Knowledge/Skills:
- Primavera P6 (Expert User)
- Acumen Fuse (Advanced Analytics)
- Power BI (Data Visualization & Dashboards)
Description:
- Master Schedule Ownership: Develop, monitor, and update the owner's Project Integrated Master Schedule (IMS), ensuring the seamless integration of facility construction.
- Program Architecture: Establish the schedule management program and standardized deliverables to be utilized across large-scale capital programs.
- Strategic Advisory: Interface with project stakeholders as a trusted advisor, providing expert guidance and data-backed recommendations for project sequencing and recovery.
- Baseline Management: Prepare baseline schedules and comprehensive Schedule Basis documents for approval by project leadership.
- Contractor Integration: Consolidate and validate various contractor schedules to incorporate them into the overarching IMS.
- Forensic & Critical Path Analysis: Assess impacts on the critical path and near-critical activities using Acumen Fuse to ensure schedule health (S2 Diagnostics) and logic credibility.
- Corrective Action: Monitor schedule deviations and variances; proactively assist in the development of alternative methods and "what-if" scenarios for corrective action.
- Performance Metrics: Apply Earned Value Management (EVM) methodology to measure project progress and productivity trends.
- Stakeholder Engagement: Review schedules with project team members on a regular basis to ensure accurate, timely data is incorporated.
- Advanced Reporting: Prepare and provide schedule progress reports, trending charts, and complex schedule analysis using Power BI to translate P6 data into actionable executive dashboards.
- Change Management: Maintain a rigorous record of scope changes, trends, and variances that potentially affect schedule performance.
- Quality Assurance: Assure the credibility and integrity of all information contained within the schedule.
LI-Onsite
#J-18808-Ljbffr