Job DescriptionJob Description
About the Role
We are seeking an experienced Electrical Quality Assurance / Quality Control (QA/QC) Manager for a major data center construction project in Sandersville, Georgia. This position offers an opportunity to oversee electrical installation quality on a large-scale mission-critical construction project involving underground electrical infrastructure, medium-voltage systems, and complex power distribution equipment.
The ideal candidate has extensive electrical construction experience with a strong background in inspections, testing, quality documentation, and commissioning readiness.
Key Responsibilities
- Oversee electrical quality assurance and quality control activities throughout construction.
- Inspect underground duct banks, conduit systems, electrical feeders, switchgear, transformers, and power distribution installations.
- Develop, implement, and maintain electrical Inspection and Test Plans (ITPs).
- Review electrical drawings, specifications, approved submittals, and installation procedures.
- Coordinate and document electrical testing, including insulation resistance, continuity, and high-potential testing as applicable.
- Manage nonconformance reports (NCRs), corrective actions, deficiencies, and punch-list items.
- Coordinate quality inspections with electrical superintendents, testing contractors, engineers, and commissioning teams.
- Maintain accurate quality records, inspection documentation, and turnover packages.
- Support electrical system readiness for testing, energization, and commissioning.
- Ensure compliance with applicable electrical codes, quality standards, and project requirements.
Required Qualifications
- 5+ years of electrical construction or electrical QA/QC experience .
- 3+ years in a dedicated electrical quality control or quality management role .
- Strong background in commercial, industrial, or mission-critical electrical construction.
- Experience inspecting underground electrical infrastructure and medium-voltage equipment.
- Working knowledge of megger testing, hi-pot testing, and electrical inspection procedures.
- Familiarity with NEC, applicable NFPA standards, and electrical construction specifications.
- Experience documenting inspections, NCRs, corrective actions, and project turnover.
- Ability to interpret electrical one-line diagrams, construction drawings, and equipment specifications.
- Strong organizational, technical documentation, and communication skills.
Qualifications
- Data center or hyperscale construction experience.
- Experience with medium-voltage distribution, switchgear, transformers, UPS systems, and electrical infrastructure.
- Experience supporting electrical commissioning and equipment turnover.
- Electrical trade license or relevant quality management credentials.
- Prior experience working for a major electrical construction contractor.
What This Opportunity Offers
- Highly competitive compensation based on experience.
- Responsibility for quality oversight of critical electrical infrastructure.
- Exposure to sophisticated mission-critical construction systems.
- Potential opportunities for professional advancement.
Company Description
Representing a Confidential Company
Company DescriptionRepresenting a Confidential Company
#J-18808-Ljbffr