Excavation spoil removal - SR-8 Hi-Level Bridge (Akron)
$118 / hour
Est. daily gross $1,003/truck (8.5 hrs × $118.00/hr)
The SR-8 Hi-Level Bridge replacement over the Cuyahoga valley runs through 2028. Excavation and spoil hauling will be time-and-material. Commit trucks at $118/hr for first right of refusal.
Billing Paid per hour (signed time sheet)
Job type Bridge substructure excavation / spoil
Shift 6:30 AM - 3:00 PM
Minimum 6-hour guarantee
Rate $118 / hour
Truck type 4-Axle (Tri)
Trucks needed 8
Location Akron, OH · Summit County
Source ODOT District 4 ($157.7M, thru 2028)
#J-18808-Ljbffr
Step into the Excavation spoil removal - SR-8 Hi-Level Bridge (Akron) role at M O V I N G D I R T in Akron, OH, United States and grow with us.
Learn more about the Excavation spoil removal - SR-8 Hi-Level Bridge (Akron) role in the description above.