RTX is seeking a Program Cost Schedule and Control Analyst to join the LTAMDS-LRIP finance team. The role focuses on EVMS, EACs, and cost control for a high-value production program. You will interact with directors, PMs, SCM, and engineering to drive accurate forecasting and staffing decisions.
Ideal candidates hold a finance-related degree with extensive EVMS/EAC experience and familiarity with SAP/PMX. This position offers a hybrid work model with relocation not provided.
#J-18808-Ljbffr
Are you ready to take on the Earned Value & Cost Control Lead (Program Finance) role at RTX?
This posting is for the Earned Value & Cost Control Lead (Program Finance) role at RTX, based in Tucson, AZ, United States.
We are looking to fill the Earned Value & Cost Control Lead (Program Finance) position at RTX in Tucson, AZ, United States.