Who we are
TK Elevator (TKE) is a world-leading innovator in vertical transportation and urban mobility. From engineering and installation to maintenance and digital transformation, we support all mobility systems, elevators, escalators, walkways, stairlifts and boarding bridges on any platform, at any time. With digital platforms like AGILE and the IoT platform MAX, we enable smarter, safer urban movement.With more that 50,000 employees, and 1,000+ global support centers, we are moved by what moves people.
TKE – Move Beyond.
TK Elevator is currently seeking an Engineering Change Order Coordinator II in Germantown, TN.
ESSENTIAL JOB FUNCTIONS:
- Manages and drives modifications to product designs, bills of materials (BOMs), engineering drawings, and manufacturing processes from initial request through final implementation.
- Lead coordination and communication between Engineering and Manufacturing by scheduling and facilitating meetings with all change-order stakeholders to ensure process adherence, proper sequencing, and on-time completion of Engineering Change Orders (ECOs) and Manufacturing Change Orders (MCOs).
- Collaborate closely with Engineering Project Managers to ensure all required implementation dates are current, tracked, and achieved.
- Serve as central communication contact for engineering and manufacturing related to ECO/MCO, and BOM issues.
- Review ECOs/MCOs by evaluating Engineering markups to ensure standards for quality and accuracy are maintained.
- Perform dependency control of revision letters for parts with changes on different ECOs or MCOs to ensure efficient flow though manufacturing.
- Excellent interpersonal and customer service skills, with the ability to collaborate effectively across multiple departments and organizational levels.
- Highly organized with the ability to manage multiple projects, priorities, and deadlines simultaneously.
EDUCATION & EXPERIENCE:
- Bachelor’s Degree preferred, Associate’s and/or an experience equivalent in an engineering/manufacturing environment are acceptable.
- Minimum Two to Fours years of experience in an engineering and manufacturing change order environment.
- Demonstrated ability to read, interpret, analyze, and organize technical drawings, engineering documentation, and change-order records.
- Must possess knowledge of commonly-used drafting concepts, practices and procedures.
- Strong proficiency in Microsoft Office Suite, including Word, Excel, Access, PowerPoint, and Outlook.
- Experience working with Product Lifecycle Management (PLM) systems, with Windchill experience preferred.
- Ability to analyze complex plans and be able to identify errors and inefficiencies. Must be able to think quickly, often solving problems as they arise.
What makes us special
At TK Elevator, we offer more than just a role, we offer a place to grow, thrive, and make an impact.
Provided they meet all eligibility requirement under the applicable plan documents, employees will be offered
- Medical, dental, and vision coverage
- Flexible spending accounts (FSA)
- Health savings account (HSA)
- Supplemental medical plans
- Company-paid short- and long-term disability insurance
- Company-paid basic life insurance and AD&D
- Optional life and AD&D coverage
- Optional spouse and dependent life insurance
- Identity theft monitoring
- Pet insurance
- Company-paid Employee Assistance Program (EAP)
- Tuition reimbursement
- 401(k) Retirement Savings Plan with company match: Employees can contribute a portion of their pay on a pre-tax or Roth basis. The company provides a dollar-for-dollar match on the first 5% contributed.
Additional benefits include:
- 15 days of vacation per year
- 11 paid holidays each calendar year (10 fixed, 1 floating)
- Paid sick leave, per company policy
- Up to six weeks of paid parental leave (available after successful completion of 90 days of full-time employment)
Eligibility requirements for these benefits will be controlled by applicable plan documents. This is intended to provide a general description of benefits and other compensation and is not a substitute for applicable plan documents or company policies.
TK Elevator is an equal opportunity employer and committed to diversity. Qualified applicants will receive consideration for employment without regard to age, gender, race, color, religion, sexual orientation, gender identity, national origin, disability, and veteran status or any other protected status required by applicable law.
Important note:
TK Elevator is committed to a prejudice-free and diverse working environment with equal opportunities. We welcome applications from everyone we continously work towards an inclusive and barrier-free reality. Please do reach out to us and we will work on individual solutions tailored to you.
TKE – Move Beyond
#J-18808-Ljbffr